Dependable excavation, foundations, sub-bases and site preparation—the work beneath a successful exterior project.

Ground first.Finish second.One accountable sequence
GROUND / 01

Start with what the site is telling us.

Groundworks establish the load-bearing and drainage conditions for everything built above. We approach excavation and preparation methodically, taking account of access, spoil removal, existing services, formation levels and the intended finished structure.

Before excavation begins, the working plan must account for machine access, deliveries, spoil movement, neighbouring boundaries and visible or known services. Finished levels are worked backwards into formation and excavation levels.

This preparation prevents avoidable handling, protects the programme and gives the work above a properly considered starting point.

Capability across the site

From first bucket to prepared platform.

Groundworks can be delivered as a standalone package or integrated with B&H surfacing, drainage, concreting and hard landscaping.

01

Excavation and responsible spoil removal

Planned around access, ground conditions and the material that needs to leave the site.

02

Sub-base construction and compaction

Constructed to support the intended work above—not a generic depth.

03

Concrete pads, bases and slabs

Levels checked against thresholds, drainage and the final build-up.

04

Strip foundations and footings

Sequenced so reinforcement, services or specialist trades can follow safely.

05

Site clearance and level reduction

Managed with clear working areas and responsible material handling.

06

Preparation for other specialist trades

Left ready for the agreed next stage of construction.

A controlled sequence

Reduce uncertainty before increasing pace.

01

Read

Access, services, boundaries, levels and proposed loads.

02

Excavate

Remove agreed material while maintaining a safe working formation.

03

Manage

Sort, load and remove spoil or retain suitable material as planned.

04

Construct

Build foundations, drainage, sub-base or slab preparation.

05

Verify

Check levels and readiness before the next trade or finish.

Prepared foundation and oversite construction
Foundation and oversite preparation
Machine excavation of a deep service trench
Controlled service trench excavation
The site is part of the job

Access, spoil and services are not footnotes.

Restricted entrances can change the machinery, delivery sizes and removal strategy. Existing drains, water, electricity, gas or communications may influence where and how excavation proceeds. Unexpected ground must be exposed and assessed—not covered quickly.

Machine accessDelivery routeKnown servicesNeighbour boundariesSpoil destinationWeather exposure
What good preparation gives you

A stable, correctly levelled platform—and a cleaner route to completion.

✓ A stable platform for the finished work✓ One team for excavation and surfacing✓ Levels planned before materials arrive✓ Drainage considered at the preparation stage
Straight answers

Groundworks: frequently asked questions

Is groundworks suitable for my property?+

Suitability depends on access, levels, ground conditions, drainage, intended loading and the finish you want. We assess these points during a site visit before recommending a specification.

What preparation is included for groundworks?+

The quotation can include excavation, spoil removal, sub-base construction, compaction, edge restraints, drainage and the final installation. The exact depth and build-up must reflect the site rather than a one-size-fits-all figure.

How do you check for underground services before excavation?+

Available service information, visible covers, property knowledge and suitable detection or survey methods should be considered before digging. Service records are not always exact, so excavation near suspected routes requires an appropriate cautious method.

What happens to excavated soil and rubble?+

The quotation identifies expected spoil handling. Suitable material may sometimes be retained for an agreed use, while unsuitable or surplus material is loaded and taken to an appropriate facility. Access and volume affect the removal method and programme.

How long will the work take?+

Duration depends on area, access, excavation, weather, curing requirements and any drainage or groundwork. We outline the likely sequence when quoting and keep you informed if site conditions affect it.

Can you deal with drainage as part of the job?+

Yes. Falls, channels, gullies, permeable construction and soakaway measures can be considered as part of the overall design, subject to site conditions and suitable discharge arrangements.

Do you provide free quotations?+

Yes. Contact us with your postcode, approximate dimensions and a few photographs if available. We can then arrange a site visit where appropriate.

Free site visit & quotation

Tell us about your project.

Send your postcode and a short outline. B&H will contact you to discuss the site, suitable options and the next available visit.

Finished resin-bound driveway
Call for a free quote07375 984 796